Projects
Union Bridge Repairs at the Chaudière Crossing
Cultural & Civic
Cleland Jardine Engineering Ltd. was the Prime Consultant for the bridge restoration and painting project. The rehabilitation project involved detailed condition surveys of the superstructure and preparation of remedial design drawings to rectify severe corrosion of structural steel elements, reinforcement of impact damaged sections of the bridge and rehabilitation of deteriorated concrete substructures.